Solar Rooftop to MSEDCL Through Net Metering

Image
As per MSEDL commercial circular 258, following are the rules to install rooftop solar PV system under net metering: 1) The capacity of the Rooftop Solar PV system to be connected at the eligible consumer premises shall not exceed his contract Demand (in KVA) or Sanctioned load (in KW).  2) The maximum Roof-top Solar PV system capacity to be installed at eligible consumer's premises shall not exceed the cumulative capacity of the Relevant DTC which has already been utilized. 3) The variation in the capacity of the solar PV system shall be allowed within a range of 5%.  4) The capacity limits for the connectivity of the Rooftop Solar systems to the Distribution network of MSEDCL shall be as specified in MERC (Standard of performance, Period of giving supply and Determination of Compensation) Regulations, 2014 as under • Less than 8KW for single phase system • Less than 80KW for three phase system having supply voltage level of 415V • Above 80 KW to 1 MW for the supply voltage